Kbron Roofing logo
Mon–Sat 6 AM–8 PM · Sun Closed Get Estimate

Roof Replacement in San Antonio Built for Texas Weather

Full tear-off, code-correct installs, and cleanup done in days, not weeks


Patching stops making sense when the mat itself is done: granules in the gutters, curling across several slopes, hail bruising that no longer holds a seal. A roof replacement from Kbron Roofing strips every layer to the deck and rebuilds the roof as one system. Call (254) 645-5833, Monday to Saturday, 6 AM to 8 PM.

Roofer removing old shingles, exposing the plywood roof deck
San Antonio Roofer Roofing contractor in San Antonio, Texas
5.0 from 18 Google Reviews All 18 Google reviews are 5-star
Mon–Sat 6 AM–8 PM Call Monday to Saturday, 6 AM to 8 PM
Latino-Owned Identifies as Latino-owned and LGBTQ+ friendly

What Our Roof Replacement Includes

A replacement is not a bigger repair. It is a full system taken down to the deck and rebuilt in the right order, and every part of the old roof that stays behind is a part that can fail the new one.

Full Tear-Off to Deck

Every existing layer of shingles and underlayment comes off down to bare decking, because the city allows two layers at most and a third layer is never an option.

Synthetic Underlayment

Synthetic underlayment goes across the whole deck before any shingle goes down, giving the roof a continuous water-shedding layer underneath the finish.

New Flashing and Boots

Drip edge, valley metal, chimney flashing and pipe boots are all replaced, not reused, since the flashing is the part of a roof that fails first and the part a shortcut leaves in place.

Balanced Ventilation

Ridge vent goes in and the soffit intake is confirmed open, so the attic breathes instead of storing summer heat above the rooms below.

Magnet Sweep and Haul-Off

The yard, driveway and beds are magnet-swept and the dumpster is hauled away when the job is done, so the only sign of the work is the new roof.

Permit and Final Walk-Through

We pull the City of San Antonio re-roof permit, which is required on any replacement, and the final inspection closes the job on the City's record as well as ours.

What Roof Replacement in San Antonio Really Involves


A roof replacement is the full removal of every existing layer of shingles, underlayment and flashing down to the deck, followed by a rebuild in the right order. In San Antonio the timing is usually set by age: a 1990s architectural shingle roof is on its second or third covering by now, and a three-tab roof from the same era is long past the 12-to-15-year life it commonly gets in this heat.

Timing matters because roof age follows build era. The citywide median year built is 1985, Stone Oak homes date to around 2000, Sonterra to 1999 through 2005, and Alamo Ranch to 2005 through 2015, so each wave reaches replacement age in turn. If your roof is past 15 to 20 years and showing granule loss, a roof inspection with photos will show whether the mat is done or has seasons left.

How Our Roof Replacement Process Works

Replacing a roof is a sequence, and the order is the quality. Here is how the job runs, day by day, so you know what is happening on your roof at each step.

01

Schedule

Call (254) 645-5833 during hours and describe the roof age and what you are seeing: granule loss, curling, stains, hail bruising. We set a time to inspect, and the inspection covers every slope and the attic side of the deck.

02

Diagnose

We inspect the deck, the flashing and the ventilation, photograph the wear, and check how many layers are already on the roof, since a roof carrying two layers can only be torn off.

03

Fix

You get a written scope for the full replacement, with the material, the flashing work and the ventilation named, so the price you are considering is attached to a specific roof, not a general idea.

04

Finish

We tear off, rebuild, photograph the details, sweep the yard, and walk the finished roof with you before we leave.

Tools and Methods We Use on Roof Replacement Jobs

Tools & Equipment

Roofing nail gun

On a replacement the nail gun drives every fastener to the same depth, because a shingle that is over-driven or under-driven is a shingle that lifts in the first squall line.

Moisture meter

The moisture meter reads the deck before the tear-off is finished, finding the soft sheets that have to be replaced before the new underlayment goes down.

Infrared camera

The infrared camera finds the damp decking and the missed fastener before the finish covers them, when they can still be fixed without taking the new roof apart.

Chalk line and shingle cutter

A chalk line and a shingle cutter keep the courses straight across a long run, so the new roof sheds water evenly instead of channelling it toward one valley.

Pry bar and roofing hammer

The pry bar and roofing hammer strip the old layers and open the deck for inspection, which is the only way to know what the new roof is actually sitting on.

Caulking gun and roof sealant

The caulking gun and roof sealant close the small gaps at penetrations and transitions, the places where a new roof most often starts leaking in its first year.

Methods & Standards

Full tear-off, no layering

Full tear-off, no layering: with two layers already on the roof, the only lawful next step is down to the deck, and the deck is inspected before anything new goes on.

Manufacturer-spec nailing pattern

The nailing pattern follows the material maker's pattern for the design wind of 108 mph, with the fastener count and placement the pattern calls for in this city.

Synthetic underlayment across the deck

Synthetic underlayment across the deck gives the roof a continuous layer under the shingles, so a wind-driven rain that gets past the finish still has somewhere to go.

Balanced ventilation design

The ventilation design balances ridge exhaust with soffit intake, because a new roof over a hot attic ages from below as surely as from above.

When Roof Replacement Is the Right Call in San Antonio

01

A 20-year-old three-tab roof with granule loss, curling shingles, and three leak repairs in two years.

What we do: We start with the age and the failure pattern: granule loss, curling, three leak repairs in two years, and a mat that no longer holds a seal. That pattern is the roof telling you it is done, not a single detail failing.

The roof replacement scope is written, the photos are in hand, and the homeowner can act on the roof with the evidence in front of them.

02

A hailstorm bruised shingles across multiple slopes and the insurer has asked for documentation.

What we do: We mark and photograph the bruising slope by slope, count the hits, and write a scope that names the damaged slopes, so the documentation matches the roof instead of guessing at it.

The homeowner gets a written scope for the roof replacement work, with photos of the roof as it stands and a clear next step.

03

A homeowner is selling a house and the buyer’s inspector flagged the roof as near end of life.

What we do: We measure the remaining life in plain terms: the age of the roof, the granule loss, and what a buyer and their inspector will say about it, because a roof near end of life is a closing issue, not a footnote.

The roof is documented, the roof replacement work is scoped, and the homeowner decides with the evidence in hand rather than a guess.

04

A mid-century ranch in Thousand Oaks has two layers of shingles and soft decking around the chimney.

What we do: A mid-century ranch with two layers and soft decking around the chimney cannot take a third layer, so we price the tear-off to the deck and the decking repair together, with the soft sheets named before the work starts.

The roof replacement work is done in the open, with photos before and after, and the permit and the final inspection close the job on the City's record.

How Roof Replacement Runs in San Antonio

San Antonio roofs take a specific beating: 100-degree summers, UV that bakes shingles, spring hail, and clay soils that shift under the slab. A replacement is the moment to build for all of it at once, instead of patching one symptom at a time.

Neighborhoods We Serve

  • Stone Oak

    Stone Oak's 1990s and newer streets are reaching their first replacement window now, with tile-heavy streets beside architectural shingle ones and HOA rules that name the material and the colour.

  • Monte Vista

    Monte Vista's early-20th-century houses carry steep, complex roofs under mature live oaks, and many sit in a historic district, so the material and the profile are reviewed before the tear-off starts.

  • Thousand Oaks

    Thousand Oaks dates to the 1980s, which puts its roofs on their second or third covering, and the replacement decision there is usually about age, not about one storm.

  • Alamo Ranch

    Alamo Ranch is far-west master-planned building from the 1990s onward, where newer large-format shingle roofs are entering their first replacement window.

  • King William Historic District

    King William is one of the city's oldest residential districts, with Victorian and early-20th-century houses where a replacement goes through the historic review before the tear-off.

Local Conditions We Plan For

  • Spring hail season across Bexar County

    Spring hail season across Bexar County runs March through May, when about 85 percent of the large-hail reports fall, and a replacement timed after the season is inspected with that calendar in mind.

  • Summer UV and 100-degree heat

    Summer UV and 100-degree heat is the reason the ventilation is designed into the replacement instead of added later: a new roof over a hot attic ages from below.

  • Expansive clay soils

    Expansive clay soils shift under the slab as they wet and dry, and the frame movement that follows can open flashing and valley joints, which is why the replacement scope includes the transitions, not just the field.

  • Historic district review requirements

    Historic district review requirements mean the material and the profile are approved before the tear-off, not discovered afterwards, and the replacement is sequenced around the review.

Hail-Battered Stone Oak Two-Story

Before

A 19-year-old architectural shingle roof with hail bruising across the south and west slopes, granule loss in the gutters, and a stain that had appeared after the last heavy rain.

After

We tore off both slopes, replaced four sheets of soft decking, and installed Class 4 impact-rated architectural shingles with new flashing at every penetration.

Maintenance: We recommend a spring inspection after hail season and keeping the gutters clear so granule runoff does not back up under the shingles.

Before

A Monte Vista home with hail bruising that has not leaked yet on a roof that had not been looked at in years, under mature live oaks that drop limbs into the valleys.

After

We inspected the roof slope by slope, fixed the hail bruising that has not leaked yet at its source, and photographed the bruising so the homeowner could see what the ground could not show.

Maintenance: We recommend a roof replacement check each spring after hail season, and keeping valleys clear of oak leaves so water runs off instead of sitting.

Before

A Thousand Oaks home where chimney and skylight flashing failure had been patched twice without fixing the entry point, and the stain kept coming back after every storm.

After

We traced the leak back to its entry point, did the roof replacement repair there, put water on it to confirm the seal, and photographed the result.

Maintenance: We recommend checking the repaired detail each spring, since heat and hail work on the same spots year after year.

Roof Problems We Solve Before They Cost You More

Most roofs do not fail all at once. They fail at a flashing detail, a cracked boot, or a slope that lost its granules, and the damage spreads from the detail outward, which is why a replacement starts with the deck and the details, not the finish.

Problem

Missing shingles and exposed deck after wind

Missing shingles and exposed deck after wind leave the underlayment open to the next rain, and a roof that has lost shingles across several slopes is usually telling you the mat is done.

Our Fix

The fix for missing shingles and exposed deck after wind is a full tear-off when the mat has failed across the roof, with the deck inspected and the soft sheets replaced before the new system goes on.

Problem

Hail bruising that has not leaked yet

Hail bruising that has not leaked yet still breaks the shingle mat, and the granule loss that follows lets UV at the asphalt, which is how a bruise becomes a leak a season or two later.

Our Fix

We address hail bruising that has not leaked yet by documenting it slope by slope, so the replacement scope names the damage while the roof is still dry inside.

Problem

Chimney and skylight flashing failure

Chimney and skylight flashing failure is the most common leak source on an ageing roof, because the flashing moves with the frame and the sealant gives up long before the shingles do.

Our Fix

We fix the cause of the chimney and skylight flashing failure by replacing the flashing at every penetration during the replacement, not by resealing what has already failed.

Problem

Roof sagging over the ridge or between rafters

Roof sagging over the ridge or between rafters usually means the decking or the framing underneath has been wet for a long time, and it is found by walking the roof, not from the driveway.

Our Fix

The fix for roof sagging over the ridge or between rafters starts with the deck: the soft sheets come out, the framing is checked, and the new roof goes on a sound structure.

Close-up of new architectural shingles

Why San Antonio Homeowners Replace Instead of Patch

Patching buys you a season. A full replacement buys you a roof that can face hail season and the next hot summer, with new flashing at every penetration. Compare architectural shingles with standing-seam metal and clay and concrete tile before you decide.

  • A full system, not just shingles

    With roof replacement, a full system, not just shingles is the difference between a roof that holds and a roof that leaks in its first year: underlayment, flashing, ventilation and finish, installed in the right order.

  • New flashing at every penetration

    New flashing at every penetration is one of the reasons homeowners choose our roof replacement work, because the flashing is where most roofs fail and the part a shortcut leaves behind.

  • Ventilation that takes heat out

    Ventilation that takes heat out is built into the roof replacement work, not added on top of it, so the new shingles are not cooked from below by the attic they sit over.

  • Photos of every layer we installed

    With roof replacement, photos of every layer we installed is the difference between a roof you hope is right and a roof you can see is right, layer by layer.

What to Know Before You Hire a Roofer for Roof Replacement in San Antonio

What to Check Before You Hire

  • Texas does not issue a statewide roofing licence; the City of San Antonio requires contractor registration for re-roof permits.
  • A full tear-off to the deck is the only way to see soft or rotted decking. A second layer over a failed roof hides the problem and counts against the City's two-layer maximum.
  • Ask for slope-by-slope photos and a written scope before work starts, so the insurer or adjuster can review the same record you saw.
  • Most large hail in Bexar County falls from March to May, so a spring replacement should be scheduled with hail season in mind.
  • Kbron Roofing is at 6 Irongate Creek, San Antonio, TX 78238, open Monday to Saturday, 6 AM to 8 PM, closed Sunday. Call (254) 645-5833 during hours.

Google Reviews

Kbron Roofing holds 5.0 out of 5 from 18 Google reviews, all 5-star. Reviewers name Rene Vargas as their contact and describe honest, no-pressure service. Read short verbatim excerpts from those reviews in the Roof Replacement testimonials below.

Roof Replacement Expertise You Can Verify

We install to the adopted code and to the material maker's pattern, because that is what keeps a roof dry through hail season and August heat. Call (254) 645-5833 during hours and talk to a real person about your roof.

  • Full tear-off to the deck on every replacement, with soft decking replaced before the new roof goes on
  • Synthetic underlayment, new flashing and balanced ventilation as one system
  • City re-roof permit pulled on every replacement, as San Antonio requires
  • Slope-by-slope photos and a written scope before any work starts
  • 5.0 out of 5 from 18 Google reviews, all 5-star
Call (254) 645-5833
Stone Oak two-story homes with tile roofs

What San Antonio Homeowners Say About Roof Replacement

Short verbatim excerpts from Google reviews by customers who chose our roof replacement work. All five readable reviewers gave 5 stars two months ago; three are quoted below.

"He worked with my insurance and made it so easy. Definitely recommend them to anyone, just hear them out because I am very glad I did."

J

Joshua Garza

★★★★★ · Homeowner, San Antonio · 2 months ago · Storm and wind repair, roof installation

"He was so professional, walked me through the steps of how to make a claim with my insurance, and the whole process was super simple. The roof was installed in just one day, and the crew was incredibly clean and professional."

D

Donnovan Smith

★★★★★ · Homeowner, San Antonio · 2 months ago · Storm and wind repair, roof installation

"Rene took a genuine, zero-pressure approach. He is remarkably honest, transparent, and truly puts the customer's best interest first."

I

Imanii Roberson

★★★★★ · Homeowner, San Antonio · 2 months ago · Roof repair for storm and wind damage

Roof Replacement Questions San Antonio Homeowners Ask

Real answers to the questions we hear most often about roof replacement in San Antonio, including the permit, the layers and the timing.

How long does a roof replacement take in San Antonio?
A typical single-family home takes two to four days from tear-off to final cleanup, and most single-story homes finish in two. Larger two-story homes with complex hips and valleys take longer.
Does my roof need a permit to be replaced?
Yes. The City of San Antonio requires a re-roof permit on any replacement. Our permits and codes page explains the fee and the process.
Can you put a new roof over the old one?
San Antonio allows a maximum of two layers, and layering traps heat and hides deck rot. We tear off to the deck on every replacement so soft wood is found and fixed.
Will my insurer cover a roof replacement after hail?
When the damage is from a covered peril such as hail or wind, most Texas homeowners policies respond, and the insurer decides the scope and the payment. We document the damage with photos and a written scope your insurer or adjuster can review.
What is the best roofing material for San Antonio homes?
Architectural asphalt shingles are the most common choice and realistically last 15 to 20 years here. Standing-seam metal and tile last longer and cost more to install; the right choice depends on the house, the structure and the look you want.

Get Your Roof Replacement in San Antonio Scheduled

Call (254) 645-5833 and we will inspect your roof, photograph the damage, and give you a written scope. We work Monday to Saturday, 6 AM to 8 PM.

Call Now Call for an Estimate

Contact Kbron Roofing

Call us at (254) 645-5833 or send a message and we will get back to you during business hours. We schedule replacement inspections Monday to Saturday, 6 AM to 8 PM.

Or call us right now at (254) 645-5833 — we answer.

Kbron Roofing


  • Address

    6 Irongate Creek, San Antonio, TX 78238, United States, San Antonio, Texas

  • Hours

    Mon–Sat: 6 AM – 8 PM

Call (254) 645-5833 Get Quote
Call Quote