Full Tear-Off to Deck
Every existing layer of shingles and underlayment comes off down to bare decking, because the city allows two layers at most and a third layer is never an option.
A replacement is not a bigger repair. It is a full system taken down to the deck and rebuilt in the right order, and every part of the old roof that stays behind is a part that can fail the new one.
Every existing layer of shingles and underlayment comes off down to bare decking, because the city allows two layers at most and a third layer is never an option.
Synthetic underlayment goes across the whole deck before any shingle goes down, giving the roof a continuous water-shedding layer underneath the finish.
Drip edge, valley metal, chimney flashing and pipe boots are all replaced, not reused, since the flashing is the part of a roof that fails first and the part a shortcut leaves in place.
Ridge vent goes in and the soffit intake is confirmed open, so the attic breathes instead of storing summer heat above the rooms below.
The yard, driveway and beds are magnet-swept and the dumpster is hauled away when the job is done, so the only sign of the work is the new roof.
We pull the City of San Antonio re-roof permit, which is required on any replacement, and the final inspection closes the job on the City's record as well as ours.
A roof replacement is the full removal of every existing layer of shingles, underlayment and flashing down to the deck, followed by a rebuild in the right order. In San Antonio the timing is usually set by age: a 1990s architectural shingle roof is on its second or third covering by now, and a three-tab roof from the same era is long past the 12-to-15-year life it commonly gets in this heat.
Timing matters because roof age follows build era. The citywide median year built is 1985, Stone Oak homes date to around 2000, Sonterra to 1999 through 2005, and Alamo Ranch to 2005 through 2015, so each wave reaches replacement age in turn. If your roof is past 15 to 20 years and showing granule loss, a roof inspection with photos will show whether the mat is done or has seasons left.
Replacing a roof is a sequence, and the order is the quality. Here is how the job runs, day by day, so you know what is happening on your roof at each step.
Schedule
Call (254) 645-5833 during hours and describe the roof age and what you are seeing: granule loss, curling, stains, hail bruising. We set a time to inspect, and the inspection covers every slope and the attic side of the deck.
Diagnose
We inspect the deck, the flashing and the ventilation, photograph the wear, and check how many layers are already on the roof, since a roof carrying two layers can only be torn off.
Fix
You get a written scope for the full replacement, with the material, the flashing work and the ventilation named, so the price you are considering is attached to a specific roof, not a general idea.
Finish
We tear off, rebuild, photograph the details, sweep the yard, and walk the finished roof with you before we leave.
Roofing nail gun
On a replacement the nail gun drives every fastener to the same depth, because a shingle that is over-driven or under-driven is a shingle that lifts in the first squall line.
Moisture meter
The moisture meter reads the deck before the tear-off is finished, finding the soft sheets that have to be replaced before the new underlayment goes down.
Infrared camera
The infrared camera finds the damp decking and the missed fastener before the finish covers them, when they can still be fixed without taking the new roof apart.
Chalk line and shingle cutter
A chalk line and a shingle cutter keep the courses straight across a long run, so the new roof sheds water evenly instead of channelling it toward one valley.
Pry bar and roofing hammer
The pry bar and roofing hammer strip the old layers and open the deck for inspection, which is the only way to know what the new roof is actually sitting on.
Caulking gun and roof sealant
The caulking gun and roof sealant close the small gaps at penetrations and transitions, the places where a new roof most often starts leaking in its first year.
Full tear-off, no layering
Full tear-off, no layering: with two layers already on the roof, the only lawful next step is down to the deck, and the deck is inspected before anything new goes on.
Manufacturer-spec nailing pattern
The nailing pattern follows the material maker's pattern for the design wind of 108 mph, with the fastener count and placement the pattern calls for in this city.
Synthetic underlayment across the deck
Synthetic underlayment across the deck gives the roof a continuous layer under the shingles, so a wind-driven rain that gets past the finish still has somewhere to go.
Balanced ventilation design
The ventilation design balances ridge exhaust with soffit intake, because a new roof over a hot attic ages from below as surely as from above.
01
What we do: We start with the age and the failure pattern: granule loss, curling, three leak repairs in two years, and a mat that no longer holds a seal. That pattern is the roof telling you it is done, not a single detail failing.
The roof replacement scope is written, the photos are in hand, and the homeowner can act on the roof with the evidence in front of them.
02
What we do: We mark and photograph the bruising slope by slope, count the hits, and write a scope that names the damaged slopes, so the documentation matches the roof instead of guessing at it.
The homeowner gets a written scope for the roof replacement work, with photos of the roof as it stands and a clear next step.
03
What we do: We measure the remaining life in plain terms: the age of the roof, the granule loss, and what a buyer and their inspector will say about it, because a roof near end of life is a closing issue, not a footnote.
The roof is documented, the roof replacement work is scoped, and the homeowner decides with the evidence in hand rather than a guess.
04
What we do: A mid-century ranch with two layers and soft decking around the chimney cannot take a third layer, so we price the tear-off to the deck and the decking repair together, with the soft sheets named before the work starts.
The roof replacement work is done in the open, with photos before and after, and the permit and the final inspection close the job on the City's record.
San Antonio roofs take a specific beating: 100-degree summers, UV that bakes shingles, spring hail, and clay soils that shift under the slab. A replacement is the moment to build for all of it at once, instead of patching one symptom at a time.
Stone Oak
Stone Oak's 1990s and newer streets are reaching their first replacement window now, with tile-heavy streets beside architectural shingle ones and HOA rules that name the material and the colour.
Monte Vista
Monte Vista's early-20th-century houses carry steep, complex roofs under mature live oaks, and many sit in a historic district, so the material and the profile are reviewed before the tear-off starts.
Thousand Oaks
Thousand Oaks dates to the 1980s, which puts its roofs on their second or third covering, and the replacement decision there is usually about age, not about one storm.
Alamo Ranch
Alamo Ranch is far-west master-planned building from the 1990s onward, where newer large-format shingle roofs are entering their first replacement window.
King William Historic District
King William is one of the city's oldest residential districts, with Victorian and early-20th-century houses where a replacement goes through the historic review before the tear-off.
Spring hail season across Bexar County
Spring hail season across Bexar County runs March through May, when about 85 percent of the large-hail reports fall, and a replacement timed after the season is inspected with that calendar in mind.
Summer UV and 100-degree heat
Summer UV and 100-degree heat is the reason the ventilation is designed into the replacement instead of added later: a new roof over a hot attic ages from below.
Expansive clay soils
Expansive clay soils shift under the slab as they wet and dry, and the frame movement that follows can open flashing and valley joints, which is why the replacement scope includes the transitions, not just the field.
Historic district review requirements
Historic district review requirements mean the material and the profile are approved before the tear-off, not discovered afterwards, and the replacement is sequenced around the review.
Most roofs do not fail all at once. They fail at a flashing detail, a cracked boot, or a slope that lost its granules, and the damage spreads from the detail outward, which is why a replacement starts with the deck and the details, not the finish.
Problem
Missing shingles and exposed deck after wind leave the underlayment open to the next rain, and a roof that has lost shingles across several slopes is usually telling you the mat is done.
Our Fix
The fix for missing shingles and exposed deck after wind is a full tear-off when the mat has failed across the roof, with the deck inspected and the soft sheets replaced before the new system goes on.
Problem
Hail bruising that has not leaked yet still breaks the shingle mat, and the granule loss that follows lets UV at the asphalt, which is how a bruise becomes a leak a season or two later.
Our Fix
We address hail bruising that has not leaked yet by documenting it slope by slope, so the replacement scope names the damage while the roof is still dry inside.
Problem
Chimney and skylight flashing failure is the most common leak source on an ageing roof, because the flashing moves with the frame and the sealant gives up long before the shingles do.
Our Fix
We fix the cause of the chimney and skylight flashing failure by replacing the flashing at every penetration during the replacement, not by resealing what has already failed.
Problem
Roof sagging over the ridge or between rafters usually means the decking or the framing underneath has been wet for a long time, and it is found by walking the roof, not from the driveway.
Our Fix
The fix for roof sagging over the ridge or between rafters starts with the deck: the soft sheets come out, the framing is checked, and the new roof goes on a sound structure.
Patching buys you a season. A full replacement buys you a roof that can face hail season and the next hot summer, with new flashing at every penetration. Compare architectural shingles with standing-seam metal and clay and concrete tile before you decide.
A full system, not just shingles
With roof replacement, a full system, not just shingles is the difference between a roof that holds and a roof that leaks in its first year: underlayment, flashing, ventilation and finish, installed in the right order.
New flashing at every penetration
New flashing at every penetration is one of the reasons homeowners choose our roof replacement work, because the flashing is where most roofs fail and the part a shortcut leaves behind.
Ventilation that takes heat out
Ventilation that takes heat out is built into the roof replacement work, not added on top of it, so the new shingles are not cooked from below by the attic they sit over.
Photos of every layer we installed
With roof replacement, photos of every layer we installed is the difference between a roof you hope is right and a roof you can see is right, layer by layer.
Kbron Roofing holds 5.0 out of 5 from 18 Google reviews, all 5-star. Reviewers name Rene Vargas as their contact and describe honest, no-pressure service. Read short verbatim excerpts from those reviews in the Roof Replacement testimonials below.
We install to the adopted code and to the material maker's pattern, because that is what keeps a roof dry through hail season and August heat. Call (254) 645-5833 during hours and talk to a real person about your roof.
Short verbatim excerpts from Google reviews by customers who chose our roof replacement work. All five readable reviewers gave 5 stars two months ago; three are quoted below.
"He worked with my insurance and made it so easy. Definitely recommend them to anyone, just hear them out because I am very glad I did."
Joshua Garza
★★★★★ · Homeowner, San Antonio · 2 months ago · Storm and wind repair, roof installation
"He was so professional, walked me through the steps of how to make a claim with my insurance, and the whole process was super simple. The roof was installed in just one day, and the crew was incredibly clean and professional."
Donnovan Smith
★★★★★ · Homeowner, San Antonio · 2 months ago · Storm and wind repair, roof installation
"Rene took a genuine, zero-pressure approach. He is remarkably honest, transparent, and truly puts the customer's best interest first."
Imanii Roberson
★★★★★ · Homeowner, San Antonio · 2 months ago · Roof repair for storm and wind damage
Real answers to the questions we hear most often about roof replacement in San Antonio, including the permit, the layers and the timing.
Where roof replacement work raises a question, roof repair is often the answer, and we scope it in the same visit.
View Roof RepairRoof Installation is the natural next step after roof replacement on a roof that needs more than one kind of attention.
View Roof InstallationResidential Roofing pairs with roof replacement on many San Antonio homes, and the two scopes are written together so nothing is missed.
View Residential RoofingWhere roof replacement work raises a question, roof inspection is often the answer, and we scope it in the same visit.
View Roof InspectionRoof Maintenance is the natural next step after roof replacement on a roof that needs more than one kind of attention.
View Roof MaintenanceShingle Roofing pairs with roof replacement on many San Antonio homes, and the two scopes are written together so nothing is missed.
View Shingle RoofingCall us at (254) 645-5833 or send a message and we will get back to you during business hours. We schedule replacement inspections Monday to Saturday, 6 AM to 8 PM.
Phone
(254) 645-5833Address
6 Irongate Creek, San Antonio, TX 78238, United States, San Antonio, Texas
Hours
Mon–Sat: 6 AM – 8 PM