Roof Permits and Codes in San Antonio, Explained Plainly

The re-roof permit, the adopted codes, and the approval order


A replacement roof in San Antonio sits under three things at once: a City permit, an adopted code, and an approval order, and the rules are plain once they are written down. Our permits and codes page sets out the City rules as they stand, so any roofer can be checked against them. Call (254) 645-5833, Monday to Saturday, 6 AM to 8 PM.

City of San Antonio re-roof permit document and roof plans on a desk
San Antonio Roofer Roofing contractor in San Antonio, Texas
5.0 from 18 Google Reviews All 18 Google reviews are 5-star
Mon–Sat 6 AM–8 PM Call Monday to Saturday, 6 AM to 8 PM
Latino-Owned Identifies as Latino-owned and LGBTQ+ friendly

What Our Permits and Codes Includes

The City of San Antonio requires a re-roof permit on any replacement. The fee is $28.75 flat, or $31.05 online with surcharges. That is the City fee, not our price, and the permit is pulled before the tear-off, not after.

Re-Roof Permit Required

A re-roof permit is required on any replacement in San Antonio city limits, and roofing is not on the City's no-permit list, so the permit is part of the job, not an extra.

2024 IRC and IBC Adopted

The 2024 IRC and IBC were adopted by the City on 30 January 2025 and took effect on 1 May 2025, and the energy code stays on the 2021 edition.

Design Wind 108 mph

The design wind is 108 mph, set by the City's amended climate table, and the nailing pattern and the fastener count are set to that figure, not to habit.

Two-Layer Maximum

Two layers at most may sit on a roof, and a roof already carrying two layers can only be torn off to the deck, because the city's two-layer limit is a hard stop.

City Contractor Registration

City contractor registration is the local credential for pulling a re-roof permit, and the registration class decides which jobs it covers: a no-pitch-change re-roof or a pitch change that needs full plan review.

Approval Order

The approval order is HOA first, City permit second, insurer third, and the work last, because each approval depends on the one before it.

What San Antonio Roof Permits and Codes Really Involve


The permit is the first fact. The City of San Antonio requires a re-roof permit on any replacement, and the fee is $28.75 flat, or $31.05 online with surcharges. A no-pitch-change re-roof is issued over the counter, while a change of pitch needs full plan review and an engineer's report. The adopted code is the 2024 IRC and IBC, effective 1 May 2025, the design wind is 108 mph, and the maximum is two layers. Texas has no state roofing licence, so the City's contractor registration is the local credential, and a homeowner may pull the permit with proof of ownership.

The code is the second fact. San Antonio adopted the 2024 International Residential Code and International Building Code on 30 January 2025, effective 1 May 2025, with a design wind speed of 108 mph and a maximum of two layers of roofing. The third fact is the licence question: Texas does not issue a statewide roofing licence; the City of San Antonio requires contractor registration for re-roof permits. We do not claim to hold any registration or certification, and you should ask any roofer for theirs. If an HOA is involved, see HOA approval help; if a historic district is involved, see historic district roofing.

How the Approval Order Works

How the approval order works: HOA first, City second, insurer third, work last, so each approval is in hand before the next one is asked for.

01

Schedule

Call (254) 645-5833 during hours and tell us the address and the roof. We check the HOA, the district and the permit, and we set a time to inspect.

02

Diagnose

We inspect the roof, photograph the wear and the flashing, and check the approvals the job needs, so the scope is written from the roof and the rules it sits under.

03

Fix

You get a written scope for the permit work, naming the approvals, the fee and the order, so the decision is specific.

04

Finish

We get the approvals in order, pull the permit, and walk the finished job with you before we leave.

Tools and Methods We Use on Permits and Codes Jobs

Tools & Equipment

Permit paperwork

On a permits job the permit paperwork is how we check the work before it starts, because the approvals have to be in hand before the tear-off, not after it.

House plan and roof plan

We use the house plan and roof plan on every permits visit to read the pitch, the layers and the structure, so the permit application names the roof that is actually there.

Moisture meter

The moisture meter is how we check permits and codes work before it is covered up, so a wet deck under the old roof is found while it can still be fixed.

Camera for documentation

On a permits job the camera for documentation earns its keep on the first slope, photographing the roof before the work, so the record matches the roof.

Safety harness and roofing ladder

We use the safety harness and roofing ladder on every permits visit, because a permit job is still a roofing job, and the steep slopes get worked without rushing.

Roofing hammer and utility knife

The roofing hammer and utility knife are how we check permits and codes work before it is covered up, so a soft spot or a missed nail is found while it can still be fixed.

Methods & Standards

HOA approval first

For permits and codes, HOA approval first is what keeps the job straight, because the HOA decides the look before the City decides the permit.

City permit second

We follow city permit second on permits and codes work, because the City permit is pulled after the HOA approval, not before it.

Insurer third, work last

Insurer third, work last is the rule on every permits job we do in San Antonio: the insurer is told after the permit is in hand, and the work starts after that.

Final inspection where required

For permits and codes, final inspection where required is what closes the job on the City's record, because a permit without a final inspection is a job that is not finished.

When Permits and Codes Is the Right Call in San Antonio

01

You are replacing a roof and want to know what the City requires.

What we do: We read the City's rules with you, name the permit, the fee and the order, and write a scope that follows them, because a replacement without a permit is a problem at the next sale.

The homeowner gets a written scope for the permits work, with the approvals named and the order set out, so the next step is a decision, not a guess.

02

Your HOA asked for paperwork before the tear-off starts.

What we do: We read the HOA's paperwork with you, name the exact product and colour, and get the approval in writing before the tear-off, because the HOA decides the look before the City decides the permit.

The roof is documented, the permits work is scoped, and the homeowner decides with the evidence in hand rather than a guess.

03

Your home is in a historic district and the roof needs review.

What we do: We check the district status of the address, name the review the roof needs, and write a scope that goes through the preservation office, because a historic roof is reviewed before it is worked on.

The homeowner keeps photos of the damage and a written scope for the permits work, so the next step is a decision, not a guess.

04

You are selling a house and the buyer asked whether the roof was permitted.

What we do: We read the buyer's question with you, name the permit and the final inspection, and write a scope that answers it, because a sale does not wait for a guess.

The permits scope is written, the photos are in hand, and the homeowner can act on the roof with the evidence in front of them.

How Permits and Codes Work in San Antonio

The rules are public, the fee is flat, and the order is fixed: HOA, then the City permit, then the insurer, then the work. The page sets out the rules as they stand, so any roofer can be checked against them.

Neighborhoods We Serve

  • Stone Oak

    In Stone Oak the permits and codes work follows the neighbourhood: 1990s and newer streets, tile-heavy blocks beside architectural shingle ones, and HOA rules that name the material and the colour.

  • Monte Vista

    Monte Vista is one of the San Antonio neighbourhoods where permits and codes work is shaped by the houses themselves, with early-20th-century houses in a historic district where the review comes first.

  • King William Historic District

    King William Historic District homes bring their own permits and codes pattern, with Victorian houses from the 1870s to the 1890s where a replacement goes through the historic review before the tear-off.

  • Thousand Oaks

    In Thousand Oaks the permits and codes work follows the neighbourhood: 1980s streets on their second or third roof, where the decision is usually about age, not about one storm.

  • Westover Hills

    Westover Hills is one of the San Antonio neighbourhoods where permits and codes work is shaped by the houses themselves, with far-west master-planned streets where the roofs are newer and larger.

Local Conditions We Plan For

  • Re-roof permit required on any replacement

    When we plan permits and codes work, re-roof permit required on any replacement is on the list from the first look, because roofing is not on the City's no-permit list.

  • 2024 IRC and IBC, effective 1 May 2025

    2024 IRC and IBC, effective 1 May 2025, shapes how permits and codes work is done in this city, because the adopted code is the 2024 edition and the energy code stays on the 2021 edition.

  • Design wind speed of 108 mph

    Design wind speed of 108 mph is part of every permits job here, and the nailing pattern and the fastener count are set to the adopted code, not to habit.

  • Two-layer maximum

    When we plan permits and codes work, two-layer maximum is on the list from the first look, because a roof already carrying two layers can only be torn off to the deck.

A Replacement That Waited for the Paperwork

Before

A 19-year-old architectural shingle roof in Stone Oak with hail bruising across the south slope, granule loss in the gutters, and a stain that had appeared after the last heavy rain.

After

We got the HOA approval in writing first, pulled the City re-roof permit, and then tore off and rebuilt the roof, photographing each layer as it went on.

Maintenance: We recommend keeping the permit and the approval paperwork with the house records, since a buyer will ask for them at sale time.

Before

A Monte Vista home with a replacement done without a permit on a roof that had not been looked at in years, with a stain over the living room.

After

We walked the roof slope by slope, fixed the replacement done without a permit at the point of failure, and photographed the repair from both sides.

Maintenance: We recommend a permits and codes check each spring after hail season, and keeping valleys clear of oak leaves so water runs off instead of sitting.

Before

A King William Historic District home where a historic review skipped before the work had been patched twice without fixing the entry point, and the stain kept coming back.

After

We traced the leak back to its entry point, did the permits and codes repair there, put water on it to confirm the seal, and photographed the result.

Maintenance: We recommend checking the repaired detail each spring, since heat and hail work on the same spots year after year.

Permit Problems We Help You Avoid in San Antonio

Permit problems are usually order problems, and the order is the fix: HOA first, City second, insurer third, work last, so each approval is in hand before the next one is asked for.

Problem

Tear-off started before HOA approval

A tear-off started before HOA approval is a roof that has to wait, because the HOA decides the look before the City decides the permit, and the work cannot go backwards.

Our Fix

We stop the tear-off started before HOA approval, get the approval in writing, and then pull the permit, so the job that follows is the job that was approved.

Problem

A replacement done without a permit

A replacement done without a permit is a problem at the next sale, because the buyer and their inspector ask for the permit, and a roof without one is a roof without a record.

Our Fix

We document the replacement done without a permit, pull the permit where the City allows it, and write a scope that closes the record.

Problem

A historic review skipped before the work

A historic review skipped before the work is a roof that has to wait, because the historic review comes before the work, not after it.

Our Fix

We write the scope for a historic review skipped before the work, and the work is sequenced around the review, not the other way around.

Problem

A second layer added over an old roof

A second layer added over an old roof is a roof that has used up its layers, because the city allows two at most and a third layer is never an option.

Our Fix

The fix for a second layer added over an old roof is a full tear-off to the deck, with the deck inspected and the soft sheets replaced before the new system goes on.

Master-planned neighbourhood street

Why the Paperwork Matters as Much as the Roof

A roof without a permit is a roof a buyer will question, an insurer will question, and the City can question. The permit costs $28.75 flat, or $31.05 online with surcharges, and it is the cheapest protection on the job. See roof replacement for the work itself.

  • Permit pulled before tear-off

    With permits and codes, permit pulled before tear-off is the difference between a roof that is on the City's record and a roof that is a problem at the next sale.

  • Approval order followed

    Approval order followed is one of the reasons homeowners choose our permits work, because HOA first, City second, insurer third, and work last is an order, not a suggestion.

  • Code and fee named up front

    Code and fee named up front is built into the permits and codes work, not added on top of it, so the rules the job follows are written down before the work starts.

  • Paperwork kept with the house

    With permits and codes, paperwork kept with the house is the difference between a roof you hope was permitted and a roof you can prove was permitted, with the permit and the final inspection on file.

What to Know Before You Hire a Roofer for Permits and Codes in San Antonio

What to Check Before You Hire

  • Texas does not issue a statewide roofing licence; the City of San Antonio requires contractor registration for re-roof permits.
  • A re-roof permit is required on any roof replacement in San Antonio. The City fee is $28.75, or $31.05 filed online.
  • The City adopted the 2024 International Residential and Building Codes, effective 1 May 2025, with a design wind speed of 108 mph.
  • The City allows a maximum of two roof layers. A third layer is not a repair option, it is a tear-off.
  • Kbron Roofing is at 6 Irongate Creek, San Antonio, TX 78238, open Monday to Saturday, 6 AM to 8 PM, closed Sunday. Call (254) 645-5833 during hours.

Google Reviews

Kbron Roofing holds 5.0 out of 5 from 18 Google reviews, all 5-star. Reviewers name Rene Vargas as their contact and describe honest, no-pressure service. Read short verbatim excerpts from those reviews in the Permits and Codes testimonials below.

Permit and Code Knowledge You Can Check

We pull the City re-roof permit on every replacement, and we follow the approval order: HOA first, City second. Call (254) 645-5833 during hours.

  • Re-roof permit required on any replacement, as San Antonio requires
  • 2024 IRC and IBC, effective 1 May 2025, with a design wind speed of 108 mph
  • Two-layer maximum, with tear-off to the deck on every replacement
  • Texas does not issue a statewide roofing licence; City registration is required for permits
  • 5.0 out of 5 from 18 Google reviews, all 5-star
Call (254) 645-5833
Crew installing architectural shingles

What San Antonio Homeowners Say About Permits and Codes

Short verbatim excerpts from Google reviews by customers who chose our permits and codes work. All five readable reviewers gave 5 stars two months ago; three are quoted below.

"Rene is incredibly honest, hardworking, and dedicated to his customers. He takes the time to truly understand your needs and delivers quality work and results at a price that won't break your wallet."

J

Joe Favor

★★★★★ · Homeowner, San Antonio · 2 months ago · Roof inspection, roof installation, storm and wind repair

"Rene took a genuine, zero-pressure approach. He is remarkably honest, transparent, and truly puts the customer's best interest first."

I

Imanii Roberson

★★★★★ · Homeowner, San Antonio · 2 months ago · Roof repair for storm and wind damage

"He was so professional, walked me through the steps of how to make a claim with my insurance, and the whole process was super simple. The roof was installed in just one day, and the crew was incredibly clean and professional."

D

Donnovan Smith

★★★★★ · Homeowner, San Antonio · 2 months ago · Storm and wind repair, roof installation

Permit and Code Questions San Antonio Homeowners Ask

Real answers to the questions we hear most often about permits and codes in San Antonio, including the fee and the layers allowed.

Do I need a permit to replace my roof in San Antonio?
Yes. The City of San Antonio requires a re-roof permit on any replacement. The fee is $28.75 flat, or $31.05 online with surcharges, and that is the City fee.
What building code applies to roofs in San Antonio?
San Antonio adopted the 2024 International Residential Code and International Building Code on 30 January 2025, effective 1 May 2025, with a design wind speed of 108 mph.
How many layers of roofing are allowed?
A maximum of two layers. We tear off to the deck on every replacement, because layering traps heat and hides deck rot.
Does Texas require a roofing licence?
No. Texas does not issue a statewide roofing licence. The City of San Antonio requires contractor registration for re-roof permits, and you should ask any roofer for theirs.
What order should the approvals go in?
HOA approval first, then the City permit, then the insurer, then the work. In a historic district, the historic review comes before the City permit.

Get Your Roof Permits in San Antonio Sorted

Call (254) 645-5833 and we will explain the permit, the code and the approval order for your house. Monday to Saturday, 6 AM to 8 PM.

Call Now Call for an Estimate

Contact Kbron Roofing

Call us at (254) 645-5833 or send a message and we will get back to you during business hours. We answer permit questions Monday to Saturday, 6 AM to 8 PM.

Or call us right now at (254) 645-5833 — we answer.

Kbron Roofing


  • Address

    6 Irongate Creek, San Antonio, TX 78238, United States, San Antonio, Texas

  • Hours

    Mon–Sat: 6 AM – 8 PM

Call (254) 645-5833 Get Quote
Call Quote